Thursday, June 3, 2010

Back Filling Underway

Went and took a peek at the site last night. Excavators have been there back filling both inside and outside the walls...mostly around the garage so far.

I did notice that I think the foundation for the workshop (the last garage stall) was poured as if it was a 9' wide garage door. It should be 10' wide. So that's going to have to be fixed.

View from side yard:

Garage pretty much back filled and leveled out:

And, as usual, dirt = fun:

1 comment: