Tuesday, January 4, 2011

More pictures, less talk

Granite starts coming in tomorrow.  Carpeting on Jan 19/20/21.  Spent an hour on the phone with random bozos from Qwest today when they told me I couldn't get DSL service on the $1200 line I had trenched in.  They were wrong.  As far as other updates, here's the pictures:

Garage all cleaned up and now with lighting:

Great room fan...we think this is going to be too big for the space and look cluttered with the beams.  Will probably exchange it for a smaller one:

Master bedroom fan:

Master shower entrance:

Inside master shower:


Mud room closet:

Porch stonework complete:

Per special request, a shot looking right from our front steps toward the driveway:

Workshop/tractor stall with lighting and propane heater up in the corner:

Saturday, January 1, 2011

More stone, woodwork, gutters, HVAC....and a week in bed

After getting through Christmas weekend unscathed, I proceeded to spend most of the following week stuck in bed....chills, aches, sweats....

So I didn't really get an opportunity to get out to the house for pictures until yesterday. Stonework is nearly complete. Woodwork (beams, mantles, etc) continues to be added. Gutters have been installed. Interior of garage is starting to get close to completion as the laundry sink and the garage door openers are now in place. More HVAC work has been done including some final duct work in the utility room, and placement of the forced-air unit. Air exchanger is also now in the utility room.

Coming up...final security system items on Monday. Electrician will be back continuing to do finishing work. Granite will start to go in Monday. Hardwood floor should be happening soon. Water softener Tuesday. And most important of all, tractor being delivered on Thursday! Just a little late for our near-record December snow accumulation.

Linen closet outside boys bedrooms:

Beamwork in entry foyer:

Utility room getting more full every day:

Garage interior nearing completion:

Upstairs fireplace with stone and mantle:

Master closet workwork:

More exterior stonework:



Adjustable shelving in boys' closets:

Stairs built and ready for carpet:

Thursday, December 23, 2010

Stonework pictures

Just a quick update before the Christmas weekend...one of the exterior "bump outs" now has completed stonework. Cabinet, electrical, tile, and trimwork continue to plug away on the interior.


Saturday, December 18, 2010

More tile, kitchen and bar cabinets, masonry

Sharing some pics from the last 2 days....

Tiling well underway in the master bathroom:

Some masonry is done on the exterior.  Shot is close up because there is essentially a scaffolding/tarp "tent" surrounding this area of the exterior wall.

Starting to frame up what will be beam work in the entry foyer:

And beam work in the great room vault:

Front door now stained on the inside:

Cabinets starting to go up in the kitchen:

Cabinets and bar now in place in the wet bar...came with a free bartender...kinda short, though.

An enthused-looking Andy listens as Pat drones on about something related to the house to-do list....

Thursday, December 16, 2010

Things moving fast now...

Lots of activity the last week of so. Electrician finishing work, tiling, trim, cabinets all going up. propane tank delivered, geo unit installed, and stonework going up. We're still running around frantically doing this-n-that...mostly getting all the items we need for the electrician (under cabinet lighting, speakers, doorbell, etc). Also found out that our water is super-hard and way high on the iron scale.  Had the Culligan guy out there and purchased ourselves a softener.  Got plenty of money laying around at this point, might as well spend some more!

I'm sure I'm forgetting half the things that have happened the last week or so, but on with the pictures...lots of them this time:

Masonry work starting...and paying to keep it warm with electric heat (ugh):

Propane tank in place:

Various dark oak stained doors for the main level:

Andys room with light fixture and closet doors installed:

Downstairs walk out doors stained and trimmed:

Foyer light installed:

The bar cabinets for my tavern!!!

Tile by walk-out-basement doors grouted:

Gas water heater in place (the electric one in the far corner is part of the geothermal system)

Bar area coming together...tile in, and cabinetry taking shape:

Boys bathroom upstairs:

Hallway by boys' rooms:

Card table area by TV room..A/V closet trimmed up and some shelving installed:

Downstairs bathroom tiled, grouted, and cabinets in place:

now THIS is an electrical panel!

Geo unit now in place and hooked up to water tank:

Chaos in the great room and dining room:

Great room built in cabinets:

Chaos in the kitchen...including our hardwood flooring stacked up in boxes:

Laundry room cabinets installed:


Master bedroom windows stained and trimmed:

Built-in lockers in the mud room:

Powder room vanity:

TV cabinets in place, and beam built:

There are even 2 lights in our under-stairs storage area!

And looking back, what things looked like one year ago: