Thursday, December 16, 2010

Things moving fast now...

Lots of activity the last week of so. Electrician finishing work, tiling, trim, cabinets all going up. propane tank delivered, geo unit installed, and stonework going up. We're still running around frantically doing this-n-that...mostly getting all the items we need for the electrician (under cabinet lighting, speakers, doorbell, etc). Also found out that our water is super-hard and way high on the iron scale.  Had the Culligan guy out there and purchased ourselves a softener.  Got plenty of money laying around at this point, might as well spend some more!

I'm sure I'm forgetting half the things that have happened the last week or so, but on with the pictures...lots of them this time:

Masonry work starting...and paying to keep it warm with electric heat (ugh):

Propane tank in place:

Various dark oak stained doors for the main level:

Andys room with light fixture and closet doors installed:

Downstairs walk out doors stained and trimmed:

Foyer light installed:

The bar cabinets for my tavern!!!

Tile by walk-out-basement doors grouted:

Gas water heater in place (the electric one in the far corner is part of the geothermal system)

Bar area coming together...tile in, and cabinetry taking shape:

Boys bathroom upstairs:

Hallway by boys' rooms:

Card table area by TV room..A/V closet trimmed up and some shelving installed:

Downstairs bathroom tiled, grouted, and cabinets in place:

now THIS is an electrical panel!

Geo unit now in place and hooked up to water tank:

Chaos in the great room and dining room:

Great room built in cabinets:

Chaos in the kitchen...including our hardwood flooring stacked up in boxes:

Laundry room cabinets installed:


Master bedroom windows stained and trimmed:

Built-in lockers in the mud room:

Powder room vanity:

TV cabinets in place, and beam built:

There are even 2 lights in our under-stairs storage area!

And looking back, what things looked like one year ago: