Sunday, January 16, 2011

310 more hours to go!

We are now less than 2 weeks away from actually living in this house that has dominated our spare time for most of the last 18 months.

Things are moving rapidly.  Electrical fixtures nearly done.  Plumbing nearly done.  Tiling nearly done.  Final cabinetry going in. Most granite already installed.  Beamwork and stair railing nearly complete.  Hardwood floor completed.  Qwest install on Friday.  DirecTV coming next Thursday.  Carpet later this week.  We will be moving most of our stuff over there this upcoming Saturday.  Still have to get that dang mailbox up.  Oh  yeah -- I'm doing most of the low-voltage finishing work myself, so need to get that done too....

AND...the first snow-plowing with the tractor has been done!  Other than a 45-minute adventure trying to replace a shear bolt (ASDFAS@#@!%!*$#) it worked like a charm!

Pictures:

Boys bathroom:


Downstairs bathroom:


Powder Room:


Dining room light:


Downstairs fireplace granite:


Garage stairs:

Kitchen:




Laundry Room:

Master bath vanity:

Master shower:


Master tub tiling:

Pantry:

Stairway Railing:


TV cabinetry- now wired!

Pat looking forward to plowing some snow with the tractor:

Early morning after snowfall:



First time out with the tractor!

Sledding wonderland: