Roof done, interior framed, all sorts of stuff happening

As usual I have let time get away from me, and it has been over 2 weeks since I updated this thing.  Time flies when all you do is chase kids, attack the house "to do" list, and sleep.

Here's a random, non-complete, and at least 95% factual list of what has been going on:
  • Roof done
  • decking and screen porch framing done
  • interior walls framed
  • Tile finalized
  • Garage doors almost finalized
  • Electrical walk-through done (took 4 hours!)
  • Plumbing walk-through done
  • Security system research done and 95% decided on
  • started to look for lighting
  • Fireplaces framed in, including some debate on how to exactly position the one downstairs (side note will probably go with tile around this one instead of the planned stone)
  • we bought a TRACTOR..one step closer to being a true Iron Ranger!  It's a Kubota 3200 with a front-mounted snowblower!
  • I'm sure a bunch of other little details I am forgetting
So on to some new pictures (taken over several different days):

Andy in his room:

Great room windows framed in:

Workshop wall added to garage:

Stairs leading to cold storage above garage:

And the storage area itself...huge!:

First of the exterior doors installed (back door of garage):

And view of that door from the outside:

Front door has arrived, and awaits staining and installation in the garage:

Have sticks, will travel (this kid is going to love exploring when we move out there!)

Great room fireplace framed in:

Maple tree in back yard turning colors:

Front porch posts framed in and ready for stone:

Outside view of rear of house - roof shingled, porch framed, deck installed:

Tray ceiling framed in for master bedroom:

Fireplace installed in TV room:

View from screen porch:

View of entire length of deck: