Here's a random, non-complete, and at least 95% factual list of what has been going on:
- Roof done
- decking and screen porch framing done
- interior walls framed
- Tile finalized
- Garage doors almost finalized
- Electrical walk-through done (took 4 hours!)
- Plumbing walk-through done
- Security system research done and 95% decided on
- started to look for lighting
- Fireplaces framed in, including some debate on how to exactly position the one downstairs (side note will probably go with tile around this one instead of the planned stone)
- we bought a TRACTOR..one step closer to being a true Iron Ranger! It's a Kubota 3200 with a front-mounted snowblower!
- I'm sure a bunch of other little details I am forgetting
Andy in his room:
Great room windows framed in:
Workshop wall added to garage:
Stairs leading to cold storage above garage:
And the storage area itself...huge!:
First of the exterior doors installed (back door of garage):
And view of that door from the outside:
Front door has arrived, and awaits staining and installation in the garage:
Have sticks, will travel (this kid is going to love exploring when we move out there!)
Great room fireplace framed in:
Maple tree in back yard turning colors:
Front porch posts framed in and ready for stone:
Outside view of rear of house - roof shingled, porch framed, deck installed:
Tray ceiling framed in for master bedroom:
Fireplace installed in TV room:
View from screen porch:
View of entire length of deck: